Specialised railway superstructure maintenance

Repair of broken rail spikes without sleeper replacement

We restore failed rail fastening by drilling, cleaning and regenerating the hole with chemical anchor technology. The solution saves time, reduces cost and minimises operational disruption.

500+restored holes
443repaired sleepers
ČD / ŽSRreferences
Detail of a broken rail spike before repair
No 340 kg sleeper replacementLess intervention, fewer technical steps and lower risk of disturbing the track.

Problem

A broken spike disables the rail fastening

warning

Failed fastening

When the spike head breaks, the rail cannot be safely fastened in the original position.

construction

Sleeper replacement risk

The standard approach means removing and replacing the concrete sleeper, often with additional related work.

schedule

Time demanding

Sleeper replacement requires a technical procedure, manpower and a closure or significant operating restriction.

Traditional solution

Replacing the complete sleeper

The conventional method replaces the damaged sleeper with a new one. This is physically demanding, especially for a concrete sleeper of around 340 kg, and requires several follow-up steps.

  • track closure for several hours,
  • intervention in track stability and geometry,
  • ballast compaction and follow-up procedures,
  • difficult implementation in winter conditions.
Traditional railway sleeper replacement

New solution

Hole regeneration without sleeper replacement

We drill out the broken sleeper spike, clean the hole and prepare it for a regenerative insert. It is fixed with a chemical anchor to restore functional rail fastening.

1Drilling out the broken spike
2Cleaning and preparing the hole
3Inserting mesh/regenerative insert
4Sealing with chemical anchor
Drilling out a broken sleeper spikeCleaning the hole after a broken rail spikePreparing the regenerative insertRestored hole in a railway sleeper

Benefits for infrastructure managers

Less downtime, less intervention, faster restoration

directions_railway

Repair during operation

Minimises closures and traffic restrictions.

straighten

Track stability

No disturbance to track geometry and superstructure stability.

recycling

Sleeper restoration

The damaged sleeper is regenerated instead of immediately replaced.

savings

Cost efficiency

Less material, handling and related work.

Results and documentation

Proven in railway infrastructure maintenance

500+restored holes
443repaired sleepers
Statistics of repaired railway sleepersOverview of restored holes in railway sleepers

References and contact

A solution for railway infrastructure managers and maintenance teams

SlavkoServis

Fr. Hečku 38, 058 01 Poprad, Slovakia

Phone: +421 911 784 168
Email: zeleznice@slavkogroup.eu

Company ID: 45 593 124
Tax ID: 202 304 8621
VAT ID: SK 202 304 8621

České dráhy logoŽeleznice Slovenskej republiky logo
arrow_upward